Molding the Future · Practical skills worksheet

Resin drying: requirement + evidence

Connect the exact grade to the instruction, material history, and test result. Keep air readings and material-moisture results separate.

Job / material identity

Date + shift / part / full manufacturer + grade / lot / colorant, additive, and regrind references / hopper + press IDs

Applicable requirement

Supplier document + revision or retrieval date / approved preparation instruction / required conditions and moisture limit + units / test method

Equipment evidence

Setpoints separately from readings / exact labels + units / sensor locations / temperature, dew point, airflow record references / time window

Material history

Load and replenishment IDs + times / hopper inventory and throughput basis if used / stops / preparation history of added material

Material sample and result

Sample ID / collection location + time / handling + test time / instrument + method / original result + units / applicable limit

After sampling / gaps

Transfer and storage history / later additions / unknown intervals / what the sample does and does not represent

Conclusion / next action

Evidence status / missing record or measurement / owner + review time / material and product status under the plant procedure